Haisthorpe WTW Industrial

Haisthorpe WTW

Yorkshire Water is investing Β£16.8m at Haisthorpe Water Treatment Works, to create a nitrate removal plant that will enhance the reliable, sustainable, high quality drinking water provided to customers across East Yorkshire.

πŸ“ Haisthorpe, Driffield, YO25 4NX πŸ“… 18 March 2026
Bentley WTW Industrial

Bentley WTW

Bentley Water Treatment Works (WTW) and Sewage Treatment Works (STW) upgrades refer to two distinct, major infrastructure projects across the UK. Both are designed to boost environmental standards, increase processing capacity, and reduce phosphorus discharges into local rivers

πŸ“ Bentley, Doncaster πŸ“… 19 June 2024
Ackworth WTW Industrial

Ackworth WTW

Yorkshire water at Ackworth upgraded the site to increase the volume of sludge capacity installing 2 x 30m diameter holding tanks.

πŸ“ Ackworth, Pontefract πŸ“… 4 June 2025
Blackburn Meadows Infrastructure

Blackburn Meadows

Installing bases for precast units, installing wall units with infill sections, constructing gateposts for watertight gate structures and infill brush finished slabbed areas to contain any spillages from the sludge tank area and divert back into the system without polluting the river Don.

πŸ“ Blackburn Meadows, Rotherham πŸ“… 8 March 2023
Old Whittington Industrial

Old Whittington

Derbyshire County Council granted planning permission for new chemical dosing plants and motor control kiosks. This was done to ensure effluent discharges meet strict phosphorus levels mandated by the Water Industry National Environment Programme.

πŸ“ Dislike Old Whittington, Derbyshire πŸ“… 20 August 2025

Let's Add Your Project to This List

Get in touch with our team to discuss your formwork requirements.

Request a Quote