A selection of formwork contracts we're proud to have delivered across Yorkshire and beyond.
Industrial
Yorkshire Water is investing Β£16.8m at Haisthorpe Water Treatment Works, to create a nitrate removal plant that will enhance the reliable, sustainable, high quality drinking water provided to customers across East Yorkshire.
Industrial
Bentley Water Treatment Works (WTW) and Sewage Treatment Works (STW) upgrades refer to two distinct, major infrastructure projects across the UK. Both are designed to boost environmental standards, increase processing capacity, and reduce phosphorus discharges into local rivers
Industrial
Yorkshire water at Ackworth upgraded the site to increase the volume of sludge capacity installing 2 x 30m diameter holding tanks.
Infrastructure
Installing bases for precast units, installing wall units with infill sections, constructing gateposts for watertight gate structures and infill brush finished slabbed areas to contain any spillages from the sludge tank area and divert back into the system without polluting the river Don.
Industrial
Derbyshire County Council granted planning permission for new chemical dosing plants and motor control kiosks. This was done to ensure effluent discharges meet strict phosphorus levels mandated by the Water Industry National Environment Programme.